Linking your Instruction to a Matter Type
Once you have created both your instruction and matter type you will need to create a relationship between them. This will allow the instruction to be converted to that particular matter type.
- Open Modeller > Work Types and navigate to your instruction.
- Click on the Type Relationships option in the left-hand navigation.
- Click on the Link Parent or Link Child button at the top right to add a new relationship.
- Complete the form.
Parent Type | This should be your instruction work type. |
Child Type | This should be your matter type. |
Relationship Type |
Choose the relevant relationship type:
|
Options:
|
On/Off |